CV of the Founding Member and Technical Consultant of our Company (Mehmet Mahfuz TUTŞİ)


M. Mahfuz TUTŞİ; He was born in 1941 in Silvan, Diyarbakır. He completed his primary and secondary education in Silvan and high school in Diyarbakır. In 1968, he graduated from Istanbul University, Faculty of Science, Department of Geological Engineering. In the same year, he started to work as a geological engineer in the 10th Regional Directorate of the State Hydraulic Works (Fırat) Planning Department. He held this position until October 1972. Between October 1972 - March 1974 he served as a reserve officer. In April 1974, he started to work as a geological engineer in the 10th Regional Directorate of State Hydraulic Works of Turkey (DSI). He became chief engineer in 1979, branch manager in 1981, and deputy regional manager in 1989. While he was on this duty, he retired on 11.01.1999 by YERSU Mü. Sonder. Const. Taah. Tic. Ltd. Has established. He is still continuing his services in this company. He is married and has 5 children.


Some Dams prepared in DSIJeotechnical Reports

1. Batman Dam and Irrigation Engineering Geology Planning Report (1971, Diyarbakır)
2. Bedir Dam and Urfa Tunnel Engineering Geology Planning Report (1975)
3. Derik Dumluca Dam Geology Revised Planning Report (1976, Diyarbakır)
4. Batman Silvan Project, Silvan, Kayser, Sason, Fırfırkaya Dam and Tunnels Engineering Geology Preliminary Study Report (1977, Diyarbakır)
5. Batman Dam Irrigation II. Engineering Geology Planning Report (1981)
6. Diyarbakır Çınar Göksu Dam Engineering Geology Revised Planning Report (1982)
7. Kozluk Regulator Irrigation and CeffanGöleti Engineering Geology Planning Report (1983, Diyarbakır)
8. Dibni Dam Engineering Geology Revised Report of Revision (1987, Diyarbakır)
9. Batman Silvan Project Silvan Dam Irrigation Piping Solutions II. Engineering Geology Report (1993, Diyarbakır)


A few of the reports prepared by YERSU

1. Project Research and Geotechnical Report of Hakkari Aslandagi Dam (YERSU Eng., 2007, Diyarbakir)
2. Hakkâri Beyyurdu Dam Floor Project Basic Research and Geotechnical Report (YERSU Eng., 2007, Diyarbakır)
3. Hakkari-Çocuktepe Dam Floor Project Basic Research and Geotechnical Report (YERSU Eng., 2007, Diyarbakır)
4. Hakkari-GölgeliyamaçBarajı Floor Project Fundamentals and Geotechnical Report (YERSU Eng., 2007, Diyarbakır)
5. Hakkari-Çukurca Project Doğanlı and Çukurca Dams Engineering Geology and Natural Building Materials Feasibility Report (YERSU Engineering, 2009, Diyarbakır)
6. Şirvan Dam and HEPP Final Project Phase Geological and Geotechnical Geotechnical Report (YERSU Eng., August 2012, Diyarbakır)
7. Silopi Energy Group Project (Hezil Dam, Hezil-I HEPP, Hezil-II HEPP and Zorova HEPP) Engineering Geology Feasibility Report (YERSU Eng., January 2013, Diyarbakır)