PROJECT DETAILS

WORK IN PROGRESS

1- Ilısu Dam and HEPP Project ÖBKD Dam Body Injection Curtain-Test Panel-Heel Plate and Energy Tunnels and Dipsavak Drilling-Drilling and Injection Works (TEMSON-YERSU Ordinary Partnership K 2013 -... Total 190.000 m completed.)

2- Muğla Yatağan Project Muğla Drinking Water Transmission Line Tunnel Additional Geotechnical Investigations (DSİ 21st District Directorate (Aydın) - 2017 -...)

3- Consolidation Punching and Injection Applications Within the Scope of the Lower Kaleköy Dam and HEPP Construction (Kalehan Energy Group-2018 -...)

4- Curtain and Diversion Tunnels Contact Consolidation Drilling and Injection Applications within the Scope of Karakurt Dam and HEPP Construction (AGE Construction ve 2018 -...)

5- Babakaya Tunnel Gas Drilling (DSI 10th Regional Directorate (D.Bakır) ün2018 -...)

6- Making and Performing Basic and Injection Soundings, DYG Surveys, Geological and Geophysical Surveys (Erzincan Drinking Water Pipeline Tunneling and Drilling Works (DSİ 8th Regional Directorate (Erzurum) ve2018 -...)

7- Consolidation and Curtain Applications within the Scope of Çetin Dam and HEPP Construction (Limak Construction Inc. İn 2018 -... 160.000 m)