Background

Company Profile

M. Mahfuz TUTŞİ; He was born in 1941 in Silvan province of Diyarbakır province. He completed his primary and secondary education in Silvan and his high school college in Diyarbakır. In 1968, he graduated from the Geology Engineering Department of the Faculty of Science, Istanbul University. In the same year, DSİ 10th Regional Directorate started as a geological engineer at Euphrates Planning Authority. He was in this post until October 1972. Between October 1972 and March 1974, he served in the military service as a reserve officer. In April 1974, he started to work as a geological engineer at DSİ 10th Regional Directorate. In 1978 he became master of geology as a master in Istanbul University. He was the chief engineer in 1979, the branch manager in 1981, and the regional director assistant in 1989. While he was in this position, he retired on 11.01.1999 voluntarily. Sonder. Const. Taah. Tic. Ltd. He founded the company. He is still continuing his services in this company. He is married and father of 5 children.
1. Batman Dam and Irrigation Engineering Geology Planning Report (1971, Diyarbakır)
2. Bedir Dam and Urfa Tunnel Engineering Geology Planning Report (1975)
3. Derik Dumluca Dam Geological Revise Planning Report (1976, Diyarbakır)
4. Batman Silvan Project, Silvan, Kayser, Sason, Fırfırkaya Dam and Tunneling Engineering Geology Preliminary Investigation Report (1977, Diyarbakır)
5. Batman Dam Irrigation II. Engineering Geology Planning Report (1981)
6. Diyarbakir Çınar Göksu Dam Engineering Geology Revised Planning Report (1982)
7. Kozluk Regulator Irrigation and Cephan Site Engineering Geology Planning Report (1983, Diyarbakır)
8. Dibni Dam Engineering Geology Revised Discovery Report (1987, Diyarbakir)
9. Batman Silvan Project Silvan Dam Irrigation Solution II. Engineering Geology Report (1993, Diyarbakır)
1. Hakkari Aslanağı Dam Basin Project Basic Survey and Geotechnical Report (YERSU Eng., 2007, Diyarbakır)
2. Hakkâri Beyyurdu Dam Basin Project Basic Survey and Geotechnical Report (YERSU Eng., 2007, Diyarbakır)
3. Hakkari-Çocuktepe Dam Basin Project Basic Research and Geotechnical Report (YERSU Eng., 2007, Diyarbakır)
4. Hakkari-Gölgeliyamaç Barajı Kat'i Project Basic Survey and Geotechnical Report (YERSU Eng., 2007, Diyarbakır)
5. Hakkari-Çukurca Project Doğanlı and Çukurca Dams Engineering Geology and Natural Building Materials Feasibility Report (YERSU Eng., 2009, Diyarbakır)
6. Şirvan Dam and HEPP Final Project Phase Geology and Geotechnical Geotechnical Report (YERSU Eng., August 2012, Diyarbakır)
7. Silopi Energy Group Project (Hezil Dam, Hezil-I HEPP, Hezil-II HEPP and Zorova HEPP) Engineering Geology Feasibility Report (YERSU Eng., January 2013, Diyarbakır)
1. The Impact of the Batman Dam on the Properties and Dam Construction of the EvaporitliGermic Formation, Engineering Geology Seminar (1978, Bursa / Yalova)
2. The First Step of the Dicle Right Coastal Irrigation Kralkızı Dam was tendered (DSİ Bulletin, 1985, Ankara)
3. Euphrates Planning Authority and Atatürk Dam (Atatürk Dam to Implement from Thought), (DSİ 40. Year, 1994 Ankara)
4. Diyarbakır Drinking Water Project, Welding Matters (DSİ Bulletin)
5. GAP DSİ 10th Regional Directorate Project Development Status, DSİ Bülteni (No: 443-444), (August 1998, Ankara)
6. GAP DSİ 10th Regional Directorate Dicle Basin Project Development Status, TMMOB Mechanical Eng. GAP and Industry Congress Book (September 1999, Diyarbakır)
1. Our Company has been carrying out many geotechnical, drilling, injection and basic improvement works in many projects in Southeastern Anatolia Region, two of them in North Irakta.
2. The share of 31 years' experience in the company's partner and technical consultant (Mehmet Mahfuz TUTŞİ) behind the company is big. In one regard, the company has 31 years DSİ + 17 years YERSU = 48 years accumulation ..
3. Northern Iraq has similar characteristics to the GAP region in terms of topographic, geological and social structure.
4. The existing team, equipment and personnel of our company are capable of injecting 150.000 m punches and injections in Mosul Dam within 10 months and have the possibility to increase this capacity by 70% if deemed necessary.
5. Because the majority of the staff is based in the GAP Region, transportation is easy and it is easy for people to accept the business with their own consent.
6. With our partner, Turkey has made 130.000 m punches and injections in Ilisu Dam 4th Dimension in terms of the amount of energy that will be generated in terms of fill volume in Turkey.
7. Çetin Dam Injection Business with technical background, equipment, materials and personnel stoku, transportation convenience and similarity of social structure; We believe that we will do it in the best possible way and in the shortest time possible.